• Atvērt paplašināto meklēšanu
  • Aizvērt paplašināto meklēšanu
Pievienot parametrus
Dokumenta numurs
Pievienot parametrus
publicēts
pieņemts
stājies spēkā
Pievienot parametrus
Aizvērt paplašināto meklēšanu
RĪKI

Publikācijas atsauce

ATSAUCĒ IETVERT:
Financing Memorandum Agreed between the Government of the Republic of Latvia and the European Commission concerning the Grant of Assistance from the Instrument for Structural Policies for Pre-accession to the Following Measure "Technical Assistance for Road Projects located in Latvia". Publicēts oficiālajā laikrakstā "Latvijas Vēstnesis", 3.01.2002., Nr. 1 https://www.vestnesis.lv/ta/id/57099

Paraksts pārbaudīts

NĀKAMAIS

Finansu memorands Latvijas valdības un Eiropas Komisijas   vienošanās par pirmsiestāšanās strukturālās politikas instrumenta (ISPA) palīdzības piešķiršanu pasākumam "Sadzīves atkritumu apsaimniekošana Ziemeļvidzemes reģionā, Latvijā"

Vēl šajā numurā

03.01.2002., Nr. 1

PAR DOKUMENTU

Veids: starptautisks dokuments

Pieņemts: 29.11.2001.

RĪKI
Tiesību aktu un oficiālo paziņojumu oficiālā publikācija pieejama laikraksta "Latvijas Vēstnesis" drukas versijā. Piedāvājam lejuplādēt digitalizētā laidiena saturu (no Latvijas Nacionālās bibliotēkas krājuma).

ISPA Measure N°: 2001/LV/16/P/PA/007

Financing Memorandum Agreed between the Government of the Republic of Latvia and the European Commission concerning the Grant of Assistance from the Instrument for Structural Policies for Pre-accession to the Following Measure “Technical Assistance for Road Projects located in Latvia”

 

The European Commission, hereinafter referred to as “the Commission”, acting for and on behalf of the European Community, hereinafter referred to as “the Community” represented by the Director General for Regional Policy, Mr Guy Crauser, for the Commission on the one part, and The Government of the Republic of Latvia, hereinafter referred to as “the beneficiary” on the other part, have agreed as follows:

Article 1

The measure referred to in Article 2 below shall be implemented and financed out of the budgetary resources of the Community in accordance with the provisions set out in this Memorandum. The measure referred to in Article 2 below shall be implemented in line with the General Conditions annexed to the Framework Agreement signed between the Commission and the beneficiary and supplemented by the terms of this Memorandum and the provisions annexed hereto.

Article 2. Identification of the measure

The Instrument for Structural Policies for Pre-accession shall contribute, by way of a grant, towards the financing of the following measure as described in Annex I:

Measure number: 2001/LV/16/P/PA/007

Title: Technical Assistance for road projects

Duration: Start date: The date of signature of the financing memorandum by the Commission

End date: Until 31 December 2002

Location: Riga and Bauska districts

Group: transport road corridor I (Via Baltica)

Article 3. Commitment

1. The maximum public or equivalent expenditure which may be taken into account for the purpose of calculating assistance shall be e 860 000.

2. The rate of Community assistance granted to the measure is fixed at 75 % of total public or equivalent expenditure as indicated in the financing plan in Annex II.

3. The maximum amount of assistance from the Instrument for Structural Policies for Pre-accession is fixed at e 645 000.

4. An amount of e 516 000 is committed from the 2001 budget under budgetary line B7-020. Commitments in respect of subsequent instalments shall be based on the initial or revised financing plan for the measure, subject to the state of implementation of the measure and to budgetary availability.

Article 4. Payments

1. Community assistance shall cover payments on the measure for which legally binding commitments have been made by the beneficiary and for which the requisite finance has been specifically allocated. These payments must relate to the services described in Annex I.

2. Payments made before the date of signature of financing memorandum by the Commission shall not be eligible for assistance from the Instrument for Structural Policies for Pre-accession.

3. The measure described in Annex I and payments by the body responsible for the implementation of the measure shall be completed no later than 31st December 2002.

4. The report required for the payment of the final balance should be submitted not later than 6 months after this date.

5. The advance payment is fixed at e 129 000, which shall be transferred as follows:

— An amount of e 64 500 is paid out after signature of this memorandum by the beneficiary;

— The remainder is paid out following the signing of the first technical assistance contract.

Article 5. Respect of Community law and policies

The measure shall be carried out in compliance with the relevant provisions set out in the Europe Agreements and shall contribute to the achievement of Community policies, in particular those concerning environmental protection and improvement.

Article 6. Intellectual property

The Beneficiary and the authority responsible for implementation mentioned in Annex I point 3 shall ensure that they acquire all necessary intellectual property rights to studies, drawings, plans, publicity and other material made in conjunction with planning, implementation, monitoring and evaluation of the project. They shall guarantee that the Commission, or any body or person delegated by the Commission shall have access and the right to use such material. The Commission will only use such material for its own purpose.

Article 7. Permits and authorisations

Any type of permits and or authorisations required for the implementation of the measure must be provided by the competent authorities of the Beneficiary in due time and in accordance with national law.

Article 8. Specific conditions related to the measure

Without prejudice to the general provisions specified in Annex III the Community grant for the measure is subject to the following conditions:

6. No contract shall be signed under this measure unless the Commission has specifically approved the terms of reference in advance.

7. The presence of a project in the indicative list contained in Annex I does not constitute in any way a commitment of the Commission to grant financial support for the construction phase of the project.

Article 9

The implementation provisions described in the Annexes to this financing memorandum form an integral part of it.

Non-compliance with the conditions and implementation provisions shall be dealt with by the Commission according to the procedure stipulated in Annex III.1. Section VIII.

Article 10

The authentic text of this financing memorandum is the present document as signed hereunder.

 

Done at 29.11.2001.

Done at Brussels, 18.10.2001.

For the recipient Ingūna Sudraba National Authorising Officer

For the Community Guy Crauser Director General

Tiesību aktu un oficiālo paziņojumu oficiālā publikācija pieejama laikraksta "Latvijas Vēstnesis" drukas versijā.

ATSAUKSMĒM

ATSAUKSMĒM

Lūdzu ievadiet atsauksmes tekstu!